SOLAR TAURUS 60S 50Hz Gas with HRSG 7MW
The 7 MW Combined cycle plant for sale
Location
Japan
of constructions 2001
GT
Package :Solar Taurus60S 4970kw (Packaged by Mitsui Zosen)
Natural gas burning with gas compressor.
Generator 50Hz(Shinko ),6600kv
GENERATOR
SHINKO FSLK-AF-1100 6MW 6600V
HRSG
:10t/h MIURA BOILER
Steam turbine generator 1940kw( Alsthom)
Absorption chiller for GT intake air cooling
Operation started 2001/7 and now running till
2012/4(this
year)
OPTION unit: Generator
absorb chiller.
Maintenance Details:
Manufacturer’s Maintenance :
Annually in May, Aug, and December
for the boiler, steam
turbine, and gas compressor
Absorption Filter Regular
Maintenance (Once a year)