Part No: 5 x Taurus 60 unused
Antoni No: 5 x Taurus 60 unused ( AGR)

 5 x Solar Turbomach Taurus T60 6901 (5.67MW ISO) Dual Fuel
(Gas & HSD) Water Injection
Year: 2009 & 2010 – All GTGs are unused.
2 Turbines are in original packing & 3 Turbines were set down on the Foundations, but never
started.

Industrial Gas Turbine Taurus 60 (T60-7901), Compressor assembly, Turbine and combustor
assembly, Combustion system
Reduction Gear: Two stage, star compound epicyclic type
Coupling & AC Synchronous Generator 50 Hz, 11 kV, Brushless excitation system
Protection IP21, Insulation class H, Temperature Rise class F, Self-ventilated air cooled
Accessories and instrumentation
Starting System Hydraulic start motor, Hydraulic oil filter, Hydraulic pump
Dual Fuel System – Natural Gas Fuel System- Gas filter, Fuel shutoff valves, Fuel control
valve, Fuel manifold, Instrumentation, Internal piping, Gas flow meter
Liquid Fuel System – Duplex filter, High pressure speed controlled pump, Filter, Fuel shutoff
valves, Fuel manifold, Air assist system, Drain tank, Instrumentation, Internal piping,
Water Injection System – Water inlet filter, Motor driven pump, Valves and control devices,
Lubrication System – Lube-oil tank, Lube-oil heater, Main lube-oil pump, Pre/post lube-oil
pump, Lube oil cooler, duplex lube-oil filter, Electrostatic vapour extractor, Indicators and
instrumentation Internal piping
GT CompressorWashing System off-line and on-line, Water tank, Water manifold,
Instrumentation & Internal piping, On-line washing system,
Base Frame w Vibration Dampers 6
Sound Enclosure 85 dB(A) at 1m ,green field conditions Air filter housing, Alarms &
Instrumentation

Ventilation air filter system: Electric Motor driven air blowers, Pneumatically driven air
shutters
TUMATRONIC S4 Turbine Control System – Backup Failsafe PLC, PC "Real time", PC HMI
with touch screen TFT, Profibus acquisition modules
Generator Control, Synchro. & Auxiliary System – Generator measurement unit, Generator
voltage regulation, Generator protection, SPM Synchroniser, Vibration monitoring system, Gas
leakage detection system, CosPhi Card
Control System Interface – Signal exchange, Standard connection with supervisory control
systems, Desktop remote PC – installed in customer control room, Client supervision control
system interface, data processing excluded
AC Supply System, DC Supply System Starting Cubicle
24 V/DC battery charger, 24 V batteries 1 set, 24 V distribution bus
Fire Detection & Extinguishing Equipment – Electronic control unit, Infra-red detectors,
Release push-button, Horn & light signalisation, Spray nozzles, CO2 bottles
TECHNICAL PERFORMANCE PARAMETERS
Gas Turbine Generator Set Mode T60 Fuel Natural Gas
Fuel Composition Methane (CH4) % Vol. 84.4999
Ethane (C2H5) “ 9.0000
Propane (C3H8) “ 3.0000
I – Butane (C4H10) “ 2.0000
I – Pentane (C5H12) “ 0.2500
Nitrogen (N2) “ 1.2500
Sulphur Di Oxide (SO2) “ 0.0001
Reference Conditions Site Altitude m.a.s.l. 230; Relative Humidity % 60
Engine air inlet temperature ºC 15
Inlet duct pressure loss mm H2O 75
Exhaust duct pressure loss mm H2O 250
Frequency 50 Hz Power factor 0.80 (lagging)
Generator Voltage 11 kV Min. fuel gas pressure 1500 kPa(g)
Guaranteed Gas Turbine Performances (without water injection)
Electric power at alternator terminals kW 5’165; Heat Rate kJ/kWh 11’845
Nominal Exhaust Data at Full load
Exhaust gas temperature °C 508; Exhaust gas flow Kg/h 73989 Exhaust heat cooled to 170ºC
KWth 7583

Guaranteed Emissions at full load
NOx emissions with water injection < 100 ppmv @ 15%O2 CO emissions < 50 ppmv @
15%O2,
Sound Guarantees Sound pressure level at 1 meter distance dBA 85
Notes
1. The fuel composition will be as above and in accordance with Solar Fuel Specifications – ES-
9-98.
2, The performance test of the Gas Turbine is based on ISO 2314 and PCT 1985-22.
3. The turbine compressor will be cleaned prior to the performance test. Air filters shall be in
new and clean condition.
4. The plant is operated in continuous duty, under normal operating conditions.
5. For NOx guarantee water to fuel ratio is 0.3 kgH2O/kg fuel and the GT is at Full Load.
6. NOx is measured as NO and is based upon 1/2 hour measuring average value.
7. CO is based upon 1/2 hour measuring average value.
8. For sound guarantee the sound level is measured from 1 m. from equipment, 1.5m above
ground level and the background noise level must be at least 10 Dba lower than the
guaranteed value.
9. If the ambient conditions are other than the reference conditions, the measured values will be
corrected using the correction curves and detailed performance test procedure described in
supplier’s offer.
10 Power and Heat Rate are calculated as average upon the plant GTs.
3 units have been installed & 2 are still in their original packing.